SR-60 over TIGER LAKE DRAIN

16.4 MI. EAST OF SR-27 · County 105, Florida · Built 2004 · 4 Lanes · 11,900 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
160313
Year Built
2004
Length
6.4 m (21 ft)
Max Span
3.2 m
Lanes
4
Daily Traffic
11,900
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.