SR-60 EB over POLEY CREEK

1.6MI E OF COUNTY LINE RD · County 105, Florida · Built 2000 · 2 Lanes · 11,750 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
160305
Year Built
2000
Length
58.8 m (192.9 ft)
Max Span
9.9 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
11,750
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.