SR-60 EB over PEACE RIVER

0.7 MI EAST OF US-17 · County 105, Florida · Built 1947 · 2 Lanes · 13,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
160129
Year Built
1947
Length
178.3 m (585 ft)
Max Span
12.2 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
13,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$131,000
Total Project Cost
$144,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.