116TH AVE. over CAPRI ISLE CANAL

0.16MI E OF CR-699 (GULF · County 103, Florida · Built 2014 · 2 Lanes · 6,510 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
157842
Year Built
2014
Length
16.8 m (55.1 ft)
Max Span
16.8 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
6,510
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.