4TH AVE. SOUTH over BOOKER CREEK

0.2 MI. W OF 9TH ST. S · County 103, Florida · Built 1965 · 2 Lanes · 13,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
157119
Year Built
1965
Length
11.6 m (38.1 ft)
Max Span
4.6 m
Width
29 m (95.1 ft)
Lanes
2
Daily Traffic
13,000
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.