13TH/SANDS PT DR over PINE KEY CUT-OFF

0.1MI E OF BAYWAY CR-679 · County 103, Florida · Built 1957 · 2 Lanes · 1,570 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
154701
Year Built
1957
Reconstructed
1993
Length
36.6 m (120.1 ft)
Max Span
12.2 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
1,570
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.