GANDY BLVD EB over 9TH ST N (CR 803)

1MI EAST OF I-275 · County 103, Florida · Built 2017 · 2 Lanes · 22,750 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
150281
Year Built
2017
Length
157.6 m (517.1 ft)
Max Span
79.9 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
22,750
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.