SR-688A EB over SR-688
0.5MI E/O 49TH ST · County 103, Florida · Built 2024 · 3 Lanes · 32,300 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
27.893056, -82.692222
This bridge is in worse condition than 24.3% of bridges in County 103. The average bridge in Florida is 0 years old; this one is 2 years old.
Nearby Bridges
SR-686A WB over SR-688
Built 2024
SR-686A over 126TH AVENUE N
Built 2024
SR-686A WB over 126TH AVENUE N
Built 2024
SR686A ROOSEVELT W over TERMINAL BLVD
Built 2023
OLD ROOSEVELT BLVD over SKEETER CANAL
Built 2005
SR-686A EB over 43RD ST AND 118TH AVENUE
Built 2024
SR-686A WB over 43RD STREET & 118TH AVE
Built 2024
SR690 Exp Viaduct over 118th Ave/ 49th St.
Built 2024
SR-686 WB over SR-688 (ULMERTON RD)
Built 2014
SR688-ULMERTON RD over CROSS BAYOU CANAL
Built 2008
Bridge Details
- Structure #
- 150267
- Year Built
- 2024
- Length
- 183.2 m (601 ft)
- Max Span
- 83.2 m
- Width
- 17.3 m (56.8 ft)
- Lanes
- 3
- Daily Traffic
- 32,300
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A