SR-688A EB over SR-688

0.5MI E/O 49TH ST · County 103, Florida · Built 2024 · 3 Lanes · 32,300 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
150267
Year Built
2024
Length
183.2 m (601 ft)
Max Span
83.2 m
Width
17.3 m (56.8 ft)
Lanes
3
Daily Traffic
32,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.