SR-60 over CLEARWATER HARBOR

0.3MI W OF US-19A/SR-595 · County 103, Florida · Built 2005 · 4 Lanes · 37,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
150244
Year Built
2005
Length
713.2 m (2339.9 ft)
Max Span
109.7 m
Width
34.3 m (112.5 ft)
Lanes
4
Daily Traffic
37,000
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.