US-19 (SR-55) over 66TH ST (SR-693)

0.7MI N OF SR-688 · County 103, Florida · Built 1990 · 6 Lanes · 79,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
150192
Year Built
1990
Length
81.1 m (266.1 ft)
Max Span
40.5 m
Width
35.7 m (117.1 ft)
Lanes
6
Daily Traffic
79,500
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.