EILAND BLVD(CR579) over NE BRANCH OF NEW RIVER

1.7MI NORTH OF SR-54 · County 101, Florida · Built 1995 · 2 Lanes · 19,300 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
144045
Year Built
1995
Length
7.6 m (24.9 ft)
Max Span
2.1 m
Lanes
2
Daily Traffic
19,300
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.