SR-56 over Ditch (S-3AB)

0.4MI E/O MEADOW POINTE · County 101, Florida · Built 2019 · 4 Lanes · 16,300 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
140147
Year Built
2019
Length
11.6 m (38.1 ft)
Max Span
3.2 m
Lanes
4
Daily Traffic
16,300
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.