SR39 (BUCHMAN HWY) over HILLSBOROUGH RIVER

2MILES SOUTH OF US-301 · County 101, Florida · Built 2010 · 2 Lanes · 14,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
140136
Year Built
2010
Length
99.8 m (327.4 ft)
Max Span
14.3 m
Width
14.5 m (47.6 ft)
Lanes
2
Daily Traffic
14,500
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.