FORT HAMER ROAD over MANATEE RIVER

3.1MI S OF US-301 · County 081, Florida · Built 2017 · 2 Lanes · 7,900 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
134123
Year Built
2017
Length
706.5 m (2317.9 ft)
Max Span
43.9 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
7,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.