M AND J ROAD over BRANCH OF MYAKKA RIVER

0.2MI NORTH OF CLAY GULLY · County 081, Florida · Built 1970 · 2 Lanes · 294 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
134059
Year Built
1970
Length
9.1 m (29.9 ft)
Max Span
4.6 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
294
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.