I-75 (SR-93) SB over FOLEY CREEK

3.5 MI S OF SR-70 · County 081, Florida · Built 1979 · 4 Lanes · 70,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
130070
Year Built
1979
Reconstructed
2016
Length
57.9 m (190 ft)
Max Span
14.6 m
Width
21.7 m (71.2 ft)
Lanes
4
Daily Traffic
70,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$743,000
Total Project Cost
$817,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.