EL DORADO BLVD. over SHADROE CANAL

0.3MI S/O EMBERS PKWY · County 071, Florida · Built 1975 · 4 Lanes · 3,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
125708
Year Built
1975
Length
12.2 m (40 ft)
Max Span
6.1 m
Width
19.4 m (63.6 ft)
Lanes
4
Daily Traffic
3,100
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.