NE 4TH PLACE over MONTEZUMA CANAL
0.1MI S of JACARANDA PKWY · County 071, Florida · Built 1974 · 2 Lanes · 200 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
26.710094, -81.963772
This bridge is in worse condition than 28.4% of bridges in County 071. The average bridge in Florida is 0 years old; this one is 52 years old.
Nearby Bridges
NE 27TH TERRACE over EUREKA CANAL
Built 1974
KISMET PARKWAY over EUREKA CANAL
Built 1973
ANDALUSIA BLVD. over GATOR SLOUGH CANAL
Built 1980
DOUGLAS PKWY over SYRACUSE CANAL
Built 1974
ANDALUSIA BLVD. over FRONTIER CANAL
Built 1970
SANTABARBARA BL SB over FRONTIER CANAL
Built 1973
SANTABARBARA BL NB over FRONTIER CANAL
Built 1973
NE 14TH PLACE over JAGUAR CANAL
Built 2008
DEL PRADO BLVD. over JAGUAR CANAL
Built 2008
KISMET PKWY over LOCHNESS CANAL
Built 1972
Bridge Details
- Structure #
- 125654
- Year Built
- 1974
- Length
- 7.3 m (24 ft)
- Max Span
- 7.3 m
- Width
- 11.8 m (38.7 ft)
- Lanes
- 2
- Daily Traffic
- 200
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.