DANIELS PKWY EB over SIX MILE CYPRESS CREEK

0.3MI E of SIX MI CYP PKW · County 071, Florida · Built 1991 · 3 Lanes · 57,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
124074
Year Built
1991
Length
36.6 m (120.1 ft)
Max Span
9.2 m
Width
16.7 m (54.8 ft)
Lanes
3
Daily Traffic
57,000
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.