NALLE GRADE ROAD over UPPER POPASH CREEK
2.5MI EAST OF SLATER RD · County 071, Florida · Built 1978 · 2 Lanes · 1,250 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
26.7554, -81.809456
This bridge is in worse condition than 28.4% of bridges in County 071. The average bridge in Florida is 0 years old; this one is 48 years old.
Nearby Bridges
I-75 NB (SR-93) over LEE CREEK
Built 1979
I-75 SB (SR-93) over LEE CREEK
Built 1979
I-75 (SR-93) over BAYSHORE CREEK
Built 1979
NALLE GRADE ROAD over UPPER DAUGHTREY CREEK
Built 1986
SLATER ROAD over I-75 (SR-93)
Built 1979
SR-78(BAYSHORE RD) over POPASH CREEK
Built 1979
I-75 NB (SR-93) over SR-78 (BAYSHORE RD.)
Built 1979
PRITCHETT PARKWAY over POPASH CREEK
Built 1978
I-75 SB (SR-93) over SR-78 (BAYSHORE RD.)
Built 1979
SR-78(BAYSHORE RD) over STROUD CREEK
Built 1995
Bridge Details
- Structure #
- 124033
- Year Built
- 1978
- Length
- 6.6 m (21.7 ft)
- Max Span
- 3.2 m
- Width
- 9.6 m (31.5 ft)
- Lanes
- 2
- Daily Traffic
- 1,250
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.