SLATER ROAD over BRANCH OF DAUGHTREY CRK

2.1MI North of CR-78 · County 071, Florida · Built 1980 · 2 Lanes · 6,549 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
124031
Year Built
1980
Length
21.6 m (70.9 ft)
Max Span
10.9 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
6,549
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.