HARBOR DRIVE over BOCA GRANDE CANAL

0.1 MI SOUTH OF 4TH ST · County 071, Florida · Built 1970 · 2 Lanes · 4,710 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
124027
Year Built
1970
Length
12.5 m (41 ft)
Max Span
12.5 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
4,710
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.