I-75 SB (SR 93) over SIX MILE CYPRESS SLOUGH

2.3 mi. S/O SR 82 · County 071, Florida · Built 1978 · 3 Lanes · 56,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
120118
Year Built
1978
Reconstructed
2009
Length
36.9 m (121.1 ft)
Max Span
9.4 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
56,000
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.