SR 91 TPK SB 275.3 over OVER OLD HWY 50

1.2MI N OF ORANGE CTY LN · County 069, Florida · Built 2023 · 2 Lanes · 32,450 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
110612
Year Built
2023
Length
28.8 m (94.5 ft)
Max Span
28.8 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
32,450
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.