I-75 NB RAMP B-3 over SR-60
INTERSECTION SR-60 & I-75 · County 057, Florida · Built 2021 · 3 Lanes · 4,300 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
27.941, -82.329083
This bridge is in worse condition than 22.5% of bridges in County 057. The average bridge in Florida is 0 years old; this one is 5 years old.
Nearby Bridges
I-75 NB (SR-93A) over SR-60
Built 1985
I-75 SB (SR-93A) over SR-60
Built 1985
I-75 SB RAMP over SR-60
Built 1985
FALKENBURG RD. over DELANEY CREEK
Built 1999
I-75 over MEMORIAL GARDENS SLOUGH
Built 1985
I-75 NB (SR-93A) over CSX RR
Built 1983
I-75 RAMP D (NB) over CSX RR
Built 2020
I-75 SB (SR 93A) over CSX RR
Built 1983
I-75 SB TO SR-60 over CSX RR
Built 2014
PALM RIVER ROAD over DELANEY CREEK
Built 2014
Bridge Details
- Structure #
- 100851
- Year Built
- 2021
- Length
- 82.8 m (271.7 ft)
- Max Span
- 49.6 m
- Width
- 14 m (45.9 ft)
- Lanes
- 3
- Daily Traffic
- 4,300
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.