I-275 SB over ROME AVENUE
0.4MI E OF HOWARD AVE · County 057, Florida · Built 2014 · 6 Lanes · 114,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
27.956139, -82.476667
This bridge is in worse condition than 22.5% of bridges in County 057. The average bridge in Florida is 0 years old; this one is 12 years old.
Nearby Bridges
I-275 NB over Rome Ave.
Built 2009
I-275 (SR-93) SB over WILLOW AVENUE
Built 2014
I-275 NB over Willow Ave.
Built 2009
I-275 SB (SR-93) over HOWARD AVE.
Built 2014
I-275 NB over HOWARD AVENUE
Built 2008
I-275 (SR-93) SB over NORTH BLVD.
Built 1963
I-275 NB over NORTH BLVD.
Built 2009
I-275 (SR-93) over ARMENIA AVE.
Built 2014
I-275 NB over ARMENIA AVENUE
Built 2008
NORTH BLVD. over HILLSBOROUGH RIVER
Built 1959
Bridge Details
- Structure #
- 100702
- Year Built
- 2014
- Length
- 32.9 m (107.9 ft)
- Max Span
- 32.9 m
- Width
- 30.3 m (99.4 ft)
- Lanes
- 6
- Daily Traffic
- 114,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.