US-301 over HARNEY CANAL

1.3MI NORTH OF I-4 · County 057, Florida · Built 2007 · 5 Lanes · 28,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
100687
Year Built
2007
Length
60.8 m (199.5 ft)
Max Span
10.1 m
Width
37 m (121.4 ft)
Lanes
5
Daily Traffic
28,500
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.