I-4 (SR-400) over BAKER CANAL

4.2MI EAST OF I-75 · County 057, Florida · Built 1998 · 7 Lanes · 139,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
100620
Year Built
1998
Length
16.9 m (55.4 ft)
Max Span
4.4 m
Lanes
7
Daily Traffic
139,000
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.