US-92 WB RAMP G2 over I-4 WB RAMP G3

0.5 MILES WEST OF US-301 · County 057, Florida · Built 1999 · 2 Lanes · 22,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
100591
Year Built
1999
Length
42 m (137.8 ft)
Max Span
42 m
Width
18.3 m (60 ft)
Lanes
2
Daily Traffic
22,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.