SR-618EB TO I-75NB over I-75 (SR-93A)

0.9MI SOUTH OF SR-60 · County 057, Florida · Built 1985 · 1 Lanes · 25,750 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
100487
Year Built
1985
Length
154.8 m (507.9 ft)
Max Span
40.5 m
Width
9.1 m (29.9 ft)
Lanes
1
Daily Traffic
25,750
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.