I-75 SB (SR-93A) over HARNEY RD (CR-580)

2.6MI NORTH OF I-4 · County 057, Florida · Built 1983 · 3 Lanes · 78,250 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
100475
Year Built
1983
Reconstructed
2014
Length
51 m (167.3 ft)
Max Span
27 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
78,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,000
Total Project Cost
$9,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.