I-75 SB (SR-93A) over WOODBERRY ROAD

0.9MI N OF SR-60 · County 057, Florida · Built 1983 · 3 Lanes · 71,750 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
100468
Year Built
1983
Reconstructed
2013
Length
49 m (160.8 ft)
Max Span
27.4 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
71,750
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.