I-75 NB (SR-93A) over SR-582/FOWLER AVE

1.2MI NORTH OF US-301 · County 057, Florida · Built 1985 · 4 Lanes · 78,250 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
100404
Year Built
1985
Reconstructed
2012
Length
74.2 m (243.4 ft)
Max Span
27.1 m
Width
21.6 m (70.9 ft)
Lanes
4
Daily Traffic
78,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.