I-75 NB over LITTLE MANATEE RIVER

4.5MI SOUTH OF SR-674 · County 057, Florida · Built 1981 · 3 Lanes · 58,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
100352
Year Built
1981
Length
424 m (1391.1 ft)
Max Span
21 m
Width
17.9 m (58.7 ft)
Lanes
3
Daily Traffic
58,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$352,000
Total Project Cost
$358,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.