I 275 NB over COLUMBUS DRIVE

0.2MI N OF I-275 I-4 INT · County 057, Florida · Built 1963 · 3 Lanes · 48,750 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
100200
Year Built
1963
Reconstructed
2005
Length
55.4 m (181.8 ft)
Max Span
25.9 m
Width
21.4 m (70.2 ft)
Lanes
3
Daily Traffic
48,750
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.