I-275 NB (SR-93) over BUS 41 (SR-685)

0.2 MI E HILLSBORO RIVER · County 057, Florida · Built 1964 · 5 Lanes · 114,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
100110
Year Built
1964
Reconstructed
2006
Length
333.2 m (1093.2 ft)
Max Span
25.8 m
Width
25.1 m (82.3 ft)
Lanes
5
Daily Traffic
114,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.