SR-60 LEG A over I-275/SR-93

1.7 MI WEST OF DALE MABRY · County 057, Florida · Built 1958 · 1 Lanes · 3,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
100087
Year Built
1958
Reconstructed
1976
Length
112.7 m (369.8 ft)
Max Span
27.1 m
Width
10.5 m (34.4 ft)
Lanes
1
Daily Traffic
3,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.