SR-60 over ROCKY POINT CREEK

0.9 MI WEST OF SR-589 · County 057, Florida · Built 1952 · 6 Lanes · 70,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
100064
Year Built
1952
Reconstructed
1982
Length
18.8 m (61.7 ft)
Max Span
6.4 m
Width
35.7 m (117.1 ft)
Lanes
6
Daily Traffic
70,000
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.