SHELDON ROAD NB over BRUSHY CREEK

0.2MI NORTH OF WATERS AVE · County 057, Florida · Built 1967 · 2 Lanes · 12,088 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
100030
Year Built
1967
Reconstructed
1994
Length
62.5 m (205.1 ft)
Max Span
12.5 m
Width
12.1 m (39.7 ft)
Lanes
2
Daily Traffic
12,088
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.