SR-70 over HARNEY POND CANAL

7.9 MI East of US-27 · County 055, Florida · Built 1960 · 2 Lanes · 5,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
090920
Year Built
1960
Reconstructed
2000
Length
36.6 m (120.1 ft)
Max Span
12.2 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
5,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$986,000
Total Project Cost
$1,085,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.