SR 589 NB SCP 50.2 over CENTRALIA RD

5.9 MI N OF SR 50 · County 053, Florida · Built 2000 · 2 Lanes · 3,900 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
080050
Year Built
2000
Length
28.7 m (94.2 ft)
Max Span
28.7 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
3,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.