CR-78A over MARIAS SLOUGH

0.2MI W OF SR-80 · County 051, Florida · Built 1991 · 2 Lanes · 1,080 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Culvert
4
Poor

Bridge Details

Structure #
074028
Year Built
1991
Length
9.7 m (31.8 ft)
Max Span
3.3 m
Lanes
2
Daily Traffic
1,080
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.