CR-846 over CHRIS CANAL

5.5MI E of COLLIER CR-858 · County 051, Florida · Built 1954 · 2 Lanes · 600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
070036
Year Built
1954
Length
18.3 m (60 ft)
Max Span
4.6 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
600
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.