US-17 SB over CHARLIE CREEK RELIEF

8.0 MI S OF SR-66 · County 049, Florida · Built 2017 · 2 Lanes · 5,350 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
060062
Year Built
2017
Length
54.9 m (180.1 ft)
Max Span
9.1 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
5,350
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.