ENT RD PMP STA 127 over RIM CANAL
0.8MI SOUTH OF SR-78 · County 043, Florida · Built 1962 · 1 Lanes · 20 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
27.122822, -80.897575
This bridge is in worse condition than 37.3% of bridges in County 043. The average bridge in Florida is 0 years old; this one is 64 years old.
Nearby Bridges
CR78B (HUNTER RD.) over PHILS CANAL
Built 1962
SR-78 over BUCKHEAD RIDGE DRAINAGE
Built 1970
HUNTER RD over DARS DITCH
Built 1986
CR-78B (LINDA RD.) over LITTLE CANAL
Built 1965
SR-78 over KISSIMMEE R. OVERFLOW
Built 1978
SR-78 over KISSIMMEE RIVER
Built 1964
SR-78 over LEMKIN CREEK
Built 1995
SR-78 over INDIAN PRAIRIE CANAL
Built 1960
OKEECHOBEE STATE P over CANAL PERENNIAL
Built 1978
SW 28TH ST WOLF RD over RELIEF CANAL
Built 1962
Bridge Details
- Structure #
- 054014
- Year Built
- 1962
- Length
- 23 m (75.5 ft)
- Max Span
- 7.7 m
- Width
- 4.1 m (13.5 ft)
- Lanes
- 1
- Daily Traffic
- 20
- Material
- Concrete
- Design
- Slab
- Owner
- Other State Agencies
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.