SR-78 over CURRY ISLAND RELIEF

8.3 MILES EAST OF US-27 · County 043, Florida · Built 1979 · 2 Lanes · 4,409 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
050056
Year Built
1979
Length
45.7 m (149.9 ft)
Max Span
9.1 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
4,409
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.