SE 1ST COURT over SPRING RUN CANAL

0.06MI N OF SE 10TH ST · County 017, Florida · Built 1960 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
025002
Year Built
1960
Length
7.9 m (25.9 ft)
Max Span
7.9 m
Width
6.5 m (21.3 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Channel Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.