MIDWAY BLVD. over NORTH SPRING LAKE

0.4 MI WEST OF US-41 · County 015, Florida · Built 1985 · 4 Lanes · 4,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
014073
Year Built
1985
Length
31.1 m (102 ft)
Max Span
9.8 m
Width
21.4 m (70.2 ft)
Lanes
4
Daily Traffic
4,700
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.