I-75 SB (SR 93) over TUCKER GRADE

3.3 MI SOUTH OF CR-768 · County 015, Florida · Built 1979 · 3 Lanes · 24,750 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
010082
Year Built
1979
Reconstructed
2012
Length
75 m (246.1 ft)
Max Span
47.2 m
Width
18.2 m (59.7 ft)
Lanes
3
Daily Traffic
24,750
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$659,000
Total Project Cost
$725,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.