SOUTHEAST FWY over 8TH STREET
SE FRWY OVER 8TH ST · County 001, District of Columbia · Built 1970 · 10 Lanes · 114,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
38.878506, -76.994969
This bridge is in worse condition than 77% of bridges in County 001. The average bridge in District of Columbia is 0 years old; this one is 56 years old.
Nearby Bridges
Southeast Freeway over 7TH STREET
Built 1969
Ramp to WB I-695 over Exit Ramp to 9th Street
Built 2014
SB I-695 over M Street S.E.
Built 2014
NB I-695 over 11th Street S.E.
Built 2012
I-695 SE FREEWAY over 6TH STREET S.E.
Built 1968
SOUTHEAST FRWY over 4TH STREET S.E.
Built 1965
Southbound I-695 over N Street S.E.
Built 2012
I-695 over N Street S.E.
Built 2012
NB I-695 Exit Ramp over N Street S.E.
Built 2012
I-695 over O Street S.E.
Built 2012
Bridge Details
- Structure #
- 1401
- Year Built
- 1970
- Reconstructed
- 2002
- Length
- 112.2 m (368.1 ft)
- Max Span
- 24.6 m
- Width
- 51 m (167.3 ft)
- Lanes
- 10
- Daily Traffic
- 114,500
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,250,000
- Total Project Cost
- $1,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.